The Lagos State Government has attributed the recent flooding at Kusenla in Lekki Phase 1 to a technical misalignment in the drainage system, where the downstream level is higher than the existing drainage invert.
The post Kusenla Road flood caused by “technical drainage misalignment” appeared first on Nairametrics.